The grading, drainage, construction of a concrete box beam
bridge, retaining walls, signals and paving on S.R. 60 from
the 4-lane north of I-75 (L.M. 17.20) to S.R. 306 (L.M.
19.89).
The grading, drainage, construction of concrete box
bridges and a retaining wall, signals and paving on S.R.
136 from north of the S.R. 111 interchange to south of the
I-40 interchange.
The miscellaneous safety improvements and installation of
signals on Sycamore View Road from near Shelby Oaks Drive
to U.S. 70 (S.R. 1, Summer Avenue) in Memphis.
Error
Bid Express: New Roads
Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.
Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.
Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.
Easy on the eyes A cleaner look and simplified layout makes it easier to locate the things you need and get more work done.
Find opportunities faster Streamlined navigation and powerful new search and filtering tools to speed up your workflow.
Plan for some lane changes Some links will send you back to classic Bid Express. Learn more.