230065
|
031 |
CHT-MC-11 |
40 |
0 |
DELAWARE MAYES |
PAVEMENT REHABILITATION AND CABLE BARRIER INSTALLATION
CHEROKEE TURNPIKE: FROM MP 0.00 TO MP 32.00. PROJECT LENGTH
= 32.558 MILES |
230066
|
033 |
IN-MC-70B |
24 |
0 |
PUSHMATAHA |
PAVEMENT REHABILITATION (ASPHALT) INDIAN NATION TURNPIKE:
FROM MILEPOST 20.00 TO MILEPOST 30.00. PROJECT LENGTH =
9.960 MILES |
230067
|
600 |
STP-205C(108)3P |
11 |
0 |
BECKHAM |
RESURFACE (UTBWC) SH-6: FROM THE US-283 JUNCTION, EXTEND
EAST NEAR ELK CITY. PROJECT LENGTH = 10.20 MILES |
230068
|
605 |
STP-207B(116)3P |
19 |
1 |
BRYAN |
RESURFACE (ASPHALT) SH-78: FROM MAIN STREET, EXTEND NORTH
IN DURANT. PROJECT LENGTH = 5.20 MILES |
230069
|
610 |
STP-216C(112)PM |
91 |
1 |
COMANCHE |
BRIDGE AND APPROACHES SH-17: OVER LITTLE BEAVER CREEK, 5.8
MILES EAST OF THE US-277 JUNCTION NEAR ELGIN. PROJECT
LENGTH = 0.340 MILE |
220014
|
615 |
SSR-218C(101)SR |
18 |
0 |
CRAIG |
RESURFACE (ASPHALT) SH-10: FROM 13.7 MILES WEST OF THE
SH-2 JUNCTION, EXTEND WEST NEAR WELCH. PROJECT LENGTH =
4.98 MILES |
230070
|
620 |
NHPPI-4000-(184)PM |
106 |
2 |
CUSTER |
BRIDGE AND APPROACHES US-183: OVER I-40, 1.0 MILE SOUTH OF
THE I-40 BUSINESS JUNCTION IN CLINTON. PROJECT LENGTH =
0.547 MILE |
230071
|
625 |
SSR-221C(063)SR |
26 |
0 |
DELAWARE |
RESURFACE (ASPHALT) SH-25: FROM THE SH-10 JUNCTION, EXTEND
EAST NEAR GROVE. PROJECT LENGTH = 5.11 MILES |
230072
|
630 |
STP-228D(024)CI |
31 |
0 |
GREER |
BRIDGE AND APPROACHES COUNTY ROAD (EW-144): OVER SLEEPY
JOHN CREEK, 8.9 MILES WEST OF US-283 NEAR MANGUM. PROJECT
LENGTH = 0.170 MILE |
230073
|
635 |
TAP-234C(055)TP |
31 |
0 |
JEFFERSON |
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) CITY STREET (D
AVENUE): FROM THE INTERSECTION OF MAIN STREET, EXTEND EAST
IN THE CITY OF WAURIKA. PROJECT LENGTH = 0.292 MILE |
230074
|
640 |
SBR-236C(112)SB |
45 |
1 |
KAY |
BRIDGE AND APPROACHES SH-156: OVER COWSKIN CREEK, 3.8
MILES SOUTH OF THE US-177 NEAR PONCA CITY. PROJECT LENGTH =
0.253 MILE |
230075
|
645 |
CIRB-243D(046)RB |
62 |
0 |
LOVE |
BRIDGE AND APPROACHES COUNTY ROAD (AIRPORT ROAD/NS-329):
OVER SHIGGIN CREEK, 2.1 MILES NORTH OF THE SH-32 JUNCTION
NEAR MARIETTA. PROJECT LENGTH = 0.203 MILE |
230076
|
650 |
SSP-249F(078)PM |
16 |
1 |
CHEROKEE MCINTOSH MUSKOGEE OKMULGEE |
PAVEMENT MARKING AND RUMBLE STRIPS
I-40/US-59/US-64/US-69/US-75/SH-82/SH-165: AT MULTIPLE
LOCATIONS IN DISTRICT I. PROJECT LENGTH = 0.00 MILE |
210118
|
655 |
NHPPI-4000-(081)3P |
17 |
2 |
CANADIAN OKLAHOMA |
RESURFACE (ASPHALT) I-40: FROM 1.9 MILES EAST OF THE JOHN
KILPATRICK TURNPIKE INTERCHANGE, EXTEND EAST IN OKLAHOMA
CITY. PROJECT LENGTH = 3.16 MILES |
230077
|
660 |
SSP-NBIP(544)PM |
27 |
0 |
HASKELL MCINTOSH OKMULGEE |
BRIDGE WATER PROOF SEAL I-40/US-75/SH-2: AT MULTIPLE
LOCATIONS IN DISTRICT I. PROJECT LENGTH = 0.00 MILE |
230078
|
665 |
E-SAP-4000(179)ES |
26 |
0 |
POTTAWATOMIE |
BRIDGE REPAIR I-40: OVER OLD TOWN TRAIL, 0.5 MILES WEST OF
THE US-177 INTERCHANGE NEAR SHAWNEE. PROJECT LENGTH = 0.00
MILE |
230079
|
670 |
SAP-4400(105)ES |
12 |
0 |
ROGERS |
BRIDGE REPAIR I-44: REPAIR FIRE DAMAGE OVER SPUNKY CREEK,
0.3 MILES EAST OF THE SH-66 INTERCHANGE IN CATOOSA. PROJECT
LENGTH = 0.00 MILE |
230080
|
675 |
NHPP-008N(109)PM |
161 |
1 |
TEXAS |
GRADE, DRAIN, SURFACE, AND EROSION US-54: FROM SOUTH 5TH
STREET, EXTEND NORTHEAST IN GUYMON. PROJECT LENGTH = 2.449
MILES |
230022
|
685 |
STP-272B(272)IG |
134 |
0 |
TULSA |
RECONSTRUCT - NO ADDED LANES CITY STREETS (WEST MAIN
STREET, NORTH BIRCH STREET, AND SOUTH BIRCH STREET): WEST
MAIN STREET, FROM NORTH ELM STREET EXTEND EAST IN THE CITY
OF JENKS. NORTH BIRCH STREET, FROM WEST MAIN STREET EXTEND
NORTH IN CITY OF JENKS... |