230024
|
021 |
IN-MC-67 |
80 |
0 |
ATOKA |
BRIDGE REHABILITATION INDIAN NATION TURNPIKE (BRIDGE NO.
64.49): OVER BUCK CREEK, 1.4 MILES NORTH OF THE SH-43
JUNCTION NEAR DAISY. PROJECT LENGTH = 0.461 MILE |
220309
|
023 |
MU-MC-49 |
120 |
1 |
MUSKOGEE WAGONER |
AET CONVERSION (MUSKOGEE TURNPIKE) MUSKOGEE TURNPIKE: AT
THE SH-51 INTERCHANGE NEAR MILEPOST 13. AT THE US-69
INTERCHANGE NEAR MILEPOST 26. AT THE NEW MAINLINE TOLLING
NEAR MILEPOST 41. AT THE EXISTING MAINLINE TOLL BOOTH NEAR
MILEPOST 42. PROJECT LEN... |
230025
|
025 |
WR-MC-138 |
31 |
0 |
MAYES |
PAVEMENT REHABILITATION (ASPHALT) WILL ROGERS TURNPIKE:
FROM MILE NO. 265.0 TO MILE NO. 270.0 NEAR ADAIR. PROJECT
LENGTH = 4.981 MILES |
230027
|
303 |
STP-208C(106)AD |
29 |
0 |
CADDO |
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) SH-152: FROM N APACHE
AVENUE, EXTEND EAST IN BINGER. PROJECT LENGTH = 0.07 MILE |
230028
|
306 |
NHPPI-4000-(182)PM |
29 |
0 |
CANADIAN |
PAVEMENT REHABILITATION (ASPHALT) I-40: FROM 3.8 MILES
WEST OF THE US-270 JUNCTION, EXTEND EAST NEAR EL RENO.
PROJECT LENGTH = 7.030 MILES |
220270
|
312 |
STP-299S(330)IT |
29 |
0 |
BECKHAM CANADIAN CUSTER MUSKOGEE |
ITS (DYNAMIC MESSAGE SIGN) I-40: FROM ELK CITY, EXTEND
EAST TO WEBBERS FALLS. PROJECT LENGTH: 0.00 MILE |
230031
|
315 |
SSR-211N(079)SR |
16 |
1 |
CHEROKEE |
RESURFACE (ASPHALT) US-62: FROM 1.68 MILES NORTH OF THE
SH-82 JUNCTION, EXTEND NORTH NEAR TAHLEQUAH. PROJECT LENGTH
= 0.77 MILE |
220363
|
318 |
STP-212C(066)PM |
70 |
1 |
CHOCTAW |
BRIDGE AND APPROACHES SH-109: OVER HANUBBY CREEK, 4.7
MILES WEST OF THE US-271 JUNCTION NEAR GRANT. PROJECT
LENGTH = 0.151 MILE |
230032
|
321 |
STP-113C(060)CI |
25 |
0 |
CIMARRON |
RESURFACE (ASPHALT) COUNTY ROADS (NS-53/EW-31): NS-53,
FROM 3.0 MILES NORTH OF THE TEXAS STATE LINE EXTEND NORTH.
EW-31, FROM THE TEXAS COUNTY LINE, EXTEND WEST. PROJECT
LENGTH = 2.981 MILES |
230035
|
333 |
SSR-224N(093)SR |
32 |
0 |
GARFIELD |
PAVEMENT REHABILITATION (A.C. AND P.C.) US-64: FROM THE
INTERSECTION OF WILLOW ROAD AND 4TH STREET, EXTEND EAST
THEN SOUTH IN ENID. PROJECT LENGTH = 3.892 MILES |
230036
|
336 |
SSR-225C(111)SR |
13 |
0 |
GARVIN |
RESURFACE (ASPHALT) SH-145: FROM I-35, EXTEND EAST NEAR
PAOLI. PROJECT LENGTH = 2.72 MILES |
230038
|
342 |
STP-253C(066)PM |
47 |
0 |
NOWATA |
BRIDGE REHABILITATION SH-28: OVER LIGHTNING CREEK, 3.5
MILES SOUTH OF THE US-60 JUNCTION NEAR NOWATA. PROJECT
LENGTH = 0.126 MILE |
230039
|
345 |
SSR-253C(067)SR |
20 |
0 |
NOWATA |
RESURFACE (ASPHALT) US-60: FROM 5.5 MILES WEST OF THE
US-169 JUNCTION, EXTEND EAST NEAR NOWATA. PROJECT LENGTH =
5.14 MILES |
230040
|
348 |
NHPPI-4400-(108)PM |
176 |
2 |
OKLAHOMA |
GRADE, DRAIN, SURFACE, AND BRIDGE I-44: WESTBOUND TO
NORTHBOUND RAMPS AT THE I-235/US-77 INTERCHANGE IN OKLAHOMA
CITY. PROJECT LENGTH = 1.851 MILES |
230042
|
354 |
STP-162B(150)PM |
109 |
2 |
PONTOTOC |
WIDEN, RESURFACE, AND BRIDGE SH-99: FROM 0.6 MILES NORTH
OF THE SH-99A JUNCTION, EXTEND NORTH NEAR FITTSTOWN.
PROJECT LENGTH = 2.932 MILES |
230001
|
357 |
STP-270C(043)PM |
96 |
0 |
TEXAS |
GRADE, DRAIN, AND SURFACE SH-136/US-412/CITY STREET (EAST
STREET): SH-136, FROM 2.3 MILES SOUTH OF THE US-412
JUNCTION EXTEND NORTH NEAR GUYMON. US-412, FROM 0.4 MILES
SOUTHEAST OF THE US-54 JUNCTION EXTEND EAST IN GUYMON. EAST
STREET, FROM THE US-412... |
220207
|
360 |
STP-172N(455)IG |
156 |
3 |
TULSA WAGONER |
GRADE, DRAIN, SURFACE, AND BRIDGE CITY STREET (23RD
STREET): FROM HOUSTON STREET, EXTEND NORTH IN THE CITY OF
BROKEN ARROW. PROJECT LENGTH = 1.064 MILES |
230043
|
363 |
TAP-274D(038)TP |
39 |
0 |
WASHINGTON |
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) CITY STREET (SHAWNEE
AVENUE): FROM 16TH STREET, EXTEND NORTH IN THE CITY OF
BARTLESVILLE. PROJECT LENGTH = 0.26 MILE |