New Try the new experience
The new Bid Express experience is available for this page. Learn more. Maybe later

The letting has ended.
Downloads

Letting of January 19, 2023

Letting information table
Letting ID: 23011901
District ID:
Cut-Off Time: 10:30:59 AM CDT
   

Proposal table
Proposal Call Order Project ID Items Amendments Counties
(18 Active Proposals)
230024 021 IN-MC-67 80 0 ATOKA
BRIDGE REHABILITATION INDIAN NATION TURNPIKE (BRIDGE NO. 64.49): OVER BUCK CREEK, 1.4 MILES NORTH OF THE SH-43 JUNCTION NEAR DAISY. PROJECT LENGTH = 0.461 MILE
220309 023 MU-MC-49 120 1 MUSKOGEE WAGONER
AET CONVERSION (MUSKOGEE TURNPIKE) MUSKOGEE TURNPIKE: AT THE SH-51 INTERCHANGE NEAR MILEPOST 13. AT THE US-69 INTERCHANGE NEAR MILEPOST 26. AT THE NEW MAINLINE TOLLING NEAR MILEPOST 41. AT THE EXISTING MAINLINE TOLL BOOTH NEAR MILEPOST 42. PROJECT LEN...
230025 025 WR-MC-138 31 0 MAYES
PAVEMENT REHABILITATION (ASPHALT) WILL ROGERS TURNPIKE: FROM MILE NO. 265.0 TO MILE NO. 270.0 NEAR ADAIR. PROJECT LENGTH = 4.981 MILES
230027 303 STP-208C(106)AD 29 0 CADDO
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) SH-152: FROM N APACHE AVENUE, EXTEND EAST IN BINGER. PROJECT LENGTH = 0.07 MILE
230028 306 NHPPI-4000-(182)PM 29 0 CANADIAN
PAVEMENT REHABILITATION (ASPHALT) I-40: FROM 3.8 MILES WEST OF THE US-270 JUNCTION, EXTEND EAST NEAR EL RENO. PROJECT LENGTH = 7.030 MILES
220270 312 STP-299S(330)IT 29 0 BECKHAM CANADIAN CUSTER MUSKOGEE
ITS (DYNAMIC MESSAGE SIGN) I-40: FROM ELK CITY, EXTEND EAST TO WEBBERS FALLS. PROJECT LENGTH: 0.00 MILE
230031 315 SSR-211N(079)SR 16 1 CHEROKEE
RESURFACE (ASPHALT) US-62: FROM 1.68 MILES NORTH OF THE SH-82 JUNCTION, EXTEND NORTH NEAR TAHLEQUAH. PROJECT LENGTH = 0.77 MILE
220363 318 STP-212C(066)PM 70 1 CHOCTAW
BRIDGE AND APPROACHES SH-109: OVER HANUBBY CREEK, 4.7 MILES WEST OF THE US-271 JUNCTION NEAR GRANT. PROJECT LENGTH = 0.151 MILE
230032 321 STP-113C(060)CI 25 0 CIMARRON
RESURFACE (ASPHALT) COUNTY ROADS (NS-53/EW-31): NS-53, FROM 3.0 MILES NORTH OF THE TEXAS STATE LINE EXTEND NORTH. EW-31, FROM THE TEXAS COUNTY LINE, EXTEND WEST. PROJECT LENGTH = 2.981 MILES
230035 333 SSR-224N(093)SR 32 0 GARFIELD
PAVEMENT REHABILITATION (A.C. AND P.C.) US-64: FROM THE INTERSECTION OF WILLOW ROAD AND 4TH STREET, EXTEND EAST THEN SOUTH IN ENID. PROJECT LENGTH = 3.892 MILES
230036 336 SSR-225C(111)SR 13 0 GARVIN
RESURFACE (ASPHALT) SH-145: FROM I-35, EXTEND EAST NEAR PAOLI. PROJECT LENGTH = 2.72 MILES
230038 342 STP-253C(066)PM 47 0 NOWATA
BRIDGE REHABILITATION SH-28: OVER LIGHTNING CREEK, 3.5 MILES SOUTH OF THE US-60 JUNCTION NEAR NOWATA. PROJECT LENGTH = 0.126 MILE
230039 345 SSR-253C(067)SR 20 0 NOWATA
RESURFACE (ASPHALT) US-60: FROM 5.5 MILES WEST OF THE US-169 JUNCTION, EXTEND EAST NEAR NOWATA. PROJECT LENGTH = 5.14 MILES
230040 348 NHPPI-4400-(108)PM 176 2 OKLAHOMA
GRADE, DRAIN, SURFACE, AND BRIDGE I-44: WESTBOUND TO NORTHBOUND RAMPS AT THE I-235/US-77 INTERCHANGE IN OKLAHOMA CITY. PROJECT LENGTH = 1.851 MILES
230042 354 STP-162B(150)PM 109 2 PONTOTOC
WIDEN, RESURFACE, AND BRIDGE SH-99: FROM 0.6 MILES NORTH OF THE SH-99A JUNCTION, EXTEND NORTH NEAR FITTSTOWN. PROJECT LENGTH = 2.932 MILES
230001 357 STP-270C(043)PM 96 0 TEXAS
GRADE, DRAIN, AND SURFACE SH-136/US-412/CITY STREET (EAST STREET): SH-136, FROM 2.3 MILES SOUTH OF THE US-412 JUNCTION EXTEND NORTH NEAR GUYMON. US-412, FROM 0.4 MILES SOUTHEAST OF THE US-54 JUNCTION EXTEND EAST IN GUYMON. EAST STREET, FROM THE US-412...
220207 360 STP-172N(455)IG 156 3 TULSA WAGONER
GRADE, DRAIN, SURFACE, AND BRIDGE CITY STREET (23RD STREET): FROM HOUSTON STREET, EXTEND NORTH IN THE CITY OF BROKEN ARROW. PROJECT LENGTH = 1.064 MILES
230043 363 TAP-274D(038)TP 39 0 WASHINGTON
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) CITY STREET (SHAWNEE AVENUE): FROM 16TH STREET, EXTEND NORTH IN THE CITY OF BARTLESVILLE. PROJECT LENGTH = 0.26 MILE

Error

Bid Express: New Roads

Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.

Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.

Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.

No thanks