220310
|
402 |
TAP-202D(070)TP |
129 |
0 |
ALFALFA |
PEDESTRIAN AND BIKE IMPROVEMENTS CITY STREETS (5TH
STREET/7TH STREET): 5TH STREET, FROM GRAND AVENUE (US-64)
EXTEND EAST IN THE CITY OF CHEROKEE. 7TH STREET, FROM GRAND
AVENUE (US-64) EXTEND EAST IN THE CITY OF CHEROKEE. PROJECT
LENGTH = 0.914 MILE |
220340
|
405 |
HSIPG-4000(177)IT |
10 |
1 |
BECKHAM CADDO CANADIAN CUSTER |
ITS (ROAD WEATHER INFORMATION SYSTEM) I-40: FROM THE TEXAS
STATE LINE, EXTEND EAST TO THE ARKANSAS STATE LINE. PROJECT
LENGTH = 0.000 MILE |
220333
|
407 |
MC-206C(073)PM |
33 |
2 |
BLAINE |
GRADE, DRAIN, SURFACE AND BRIDGE (STRUCTURE REPAIR) SH-58:
FROM 2.5 MILES SOUTH OF THE SH-51 JUNCTION, EXTEND NORTH
NEAR CANTON. PROJECT LENGTH = 0.013 MILE |
220341
|
410 |
SBR-207N(111)SB |
64 |
1 |
BRYAN |
BRIDGE REHABILITATION US-70: OVER BIG CREEK, 1.3 MILES
EAST OF THE SH-22 JUNCTION NEAR BOKCHITO. PROJECT LENGTH =
0.171 MILE |
220271
|
412 |
STP-299S(332)IT |
27 |
1 |
CANADIAN CLEVELAND MCCLAIN OKLAHOMA |
ITS (CCTV INSTALLATION)
I-35/I-40/I-240/US-62/US-66/SH-3/SH-9: AT MULTIPLE
LOCATIONS IN DISTRICT III AND IV. PROJECT LENGTH = 0.00
MILE |
220343
|
425 |
STP-228C(027)CI |
10 |
0 |
GREER |
RESURFACE (ASPHALT) COUNTY ROAD (EW-135): FROM 4.0 MILES
EAST OF THE US-283 JUNCTION, EXTEND EAST NEAR WILLOW.
PROJECT LENGTH = 3.008 MILES |
220344
|
430 |
STP-230C(043)CI |
51 |
1 |
HARPER |
GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-199): FROM 16.8
MILES SOUTH OF THE US-64 JUNCTION, EXTEND NORTH NEAR
SELMAN. PROJECT LENGTH = 3.170 MILES |
220360
|
432 |
STP-136E(219)EH |
48 |
0 |
KAY |
ENHANCEMENTS (STANDING BEAR TRAILS) WELCOME CENTER
BEAUTIFICATION AT STANDING BEAR TRAILS IN THE CITY OF PONCA
CITY. PROJECT LENGTH = 0.00 MILE |
220345
|
435 |
STP-236C(070)AD |
56 |
0 |
KAY |
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) US-177: FROM 2.0 MILES
SOUTH OF THE SH-11 JUNCTION, EXTEND NORTH IN THE TOWN OF
BLACKWELL. PROJECT LENGTH = 2.05 MILES |
220346
|
440 |
SBR-239C(039)SB |
15 |
0 |
LATIMER |
BRIDGE PAINTING SH-1: OVER BOGGS HOLLOW CREEK AND
OVERFLOW, 0.4 MILES AND 0.6 MILES EAST OF THE SH-2 JUNCTION
NEAR BUFFALO VALLEY. PROJECT LENGTH = 0.00 MILE |
220320
|
442 |
TAP-244D(083)TP |
126 |
1 |
MCCLAIN |
DOWNTOWN STREETSCAPE CITY STREETS (W MAIN STREET/N 2ND
AVENUE): W MAIN STREET, FROM N 3RD AVENUE EXTEND EAST IN
THE CITY OF PURCELL. N 2ND AVENUE, FROM W MAIN STREET
EXTEND NORTH IN THE CITY OF PURCELL. PROJECT LENGTH = 0.230
MILE |
220347
|
445 |
NHPPI-4000-(180)PM |
17 |
1 |
MUSKOGEE SEQUOYAH |
RESURFACE (SMA AND RIL) I-40: FROM 1.0 MILE EAST OF
SH-100, EXTEND EAST NEAR WEBBERS FALLS. PROJECT LENGTH =
3.698 MILES |
220348
|
450 |
SBR-254C(061)SB |
69 |
1 |
OKFUSKEE |
BRIDGE REHABILITATION SH-48: OVER NORTH CANADIAN RIVER,
1.8 MILES SOUTH OF I-40 NEAR OKEMAH. PROJECT LENGTH = 0.00
MILE |
220370
|
451 |
STP-155C(610)PM |
90 |
1 |
OKLAHOMA |
GRADE, DRAIN, AND SURFACE SH-66: FROM 4.0 MILES EAST OF
I-35, EXTEND NORTHEAST IN EDMOND AND ARCADIA. PROJECT
LENGTH = 1.531 MILES |
220371
|
452 |
STP-155C(712)PM |
133 |
1 |
OKLAHOMA |
WIDEN, RESURFACE, AND BRIDGE SH-66: FROM 6.4 MILES EAST OF
I-35, EXTEND NORTHEAST IN ARCADIA. PROJECT LENGTH = 6.523
MILES |
220373
|
453 |
STP-155C(712)PM |
220 |
1 |
OKLAHOMA |
WIDEN, RESURFACE, BRIDGE, GRADE, DRAIN, AND SURFACE SH-66:
FROM 4.0 MILES EAST OF I-35, EXTEND NORTHEAST IN EDMOND AND
ARCADIA. PROJECT LENGTH = 8.054 MILES |
220349
|
455 |
NHPP-024N(016)PM |
38 |
0 |
OKLAHOMA |
RESURFACE (ASPHALT) US-77: FROM 0.62 MILES NORTH OF
MEMORIAL ROAD, EXTEND NORTH ON BROADWAY THEN EAST ON 2ND
STREET IN EDMOND. PROJECT LENGTH = 5.511 MILES |
220350
|
460 |
CIRB-160C(184)RB |
64 |
1 |
PAYNE |
GRADE, DRAIN, BRIDGE, AND SURFACE COUNTY ROAD (NORFOLK
ROAD/NS-353): FROM THE SH-33 JUNCTION, EXTEND NORTH NEAR
CUSHING. PROJECT LENGTH = 3.006 MILES |
220351
|
465 |
STP-260B(074)PM |
120 |
1 |
PAYNE |
BRIDGE AND APPROACHES SH-51: OVER UNNAMED CREEK, 1.6 MILES
SOUTHEAST OF THE SH-86 JUNCTION NEAR STILLWATER. PROJECT
LENGTH = 1.060 MILES |
220353
|
475 |
SBR-265C(029)SB |
51 |
1 |
ROGER MILLS |
BRIDGE REHABILITATION SH-30: OVER WASHITA RIVER, 3.7 MILES
SOUTH OF THE SH-33 JUNCTION NEAR REYDON. PROJECT LENGTH =
0.256 MILE |
220354
|
480 |
STP-268C(095)CI |
77 |
0 |
SEQUOYAH |
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROAD
(NS-467/CENTRAL HIGH ROAD): FROM 1.1 MILES NORTH OF I-40,
EXTEND NORTH NEAR SALLISAW. PROJECT LENGTH = 0.850 MILE |
220356
|
490 |
SBR-017N(289)SB |
19 |
1 |
TEXAS |
BRIDGE REHABILITATION SH-3: OVER PALO DURO CREEK, 4.0
MILES WEST OF THE BEAVER COUNTY LINE NEAR HARDESTY. PROJECT
LENGTH = 0.00 MILE |
220329
|
492 |
STP-272F(357)3B |
213 |
1 |
TULSA |
JOINT SEAL/REPAIR US-64/US-75/SH-11/SH-51/CITY STREET
(APACHE STREET): AT MULTIPLE LOCATIONS IN DIVISION VIII.
PROJECT LENGTH = 0.000 MILE |
220357
|
495 |
SBR-275C(076)SB |
56 |
1 |
WASHITA |
BRIDGE REHABILITATION SH-115: OVER SPRING CREEK, 8.2 MILES
SOUTH OF THE SH-152 JUNCTION NEAR MOUNTAINVIEW. PROJECT
LENGTH = 0.167 MILE |