New Try the new experience
The new Bid Express experience is available for this page. Learn more. Maybe later

The letting has ended.
Downloads

Letting of September 15, 2022

Letting information table
Letting ID: 22091501
District ID: ODOT
Cut-Off Time: 10:30:59 AM CDT
   

Proposal table
Proposal Call Order Project ID Items Amendments Counties
(32 Active Proposals)
220190 700 STP-202D(063)CI 48 0 ALFALFA
BRIDGE AND APPROACHES COUNTY ROAD (EW-26): OVER WEST CLAY CREEK, 0.2 MILES WEST OF THE SH-8 JUNCTION NEAR CARMEN. PROJECT LENGTH = 0.284 MILE
220282 705 STP-205B(101)CI 45 0 BECKHAM
BRIDGE AND APPROACHES COUNTY ROAD (EW-113): OVER WEST ELK CREEK, 1.4 MILES WEST OF THE SH-6 JUNCTION NEAR ELK CITY. PROJECT LENGTH = 0.161 MILE
220283 710 SSP-NBIP(538)PM 17 1 BRYAN MCCURTAIN
BRIDGE PAINTING US-70 (SB)/SH-91: US-70 (SB), OVER LITTLE RIVER 5.8 MILES NORTHEAST OF THE US-259 JUNCTION NEAR IDABEL. SH-91, OVER SAND CREEK 3.4 MILES NORTHEAST OF THE TEXAS STATE LINE NEAR COLBERT. PROJECT LENGTH = 0.00 MILE
220280 715 NHPP-211N(062)PM 98 1 CHEROKEE
INTERSECTION MODIFICATION US-62: FROM 0.2 MILES SOUTH OF THE SH-82 JUNCTION, EXTEND NORTH NEAR TAHLEQUAH. PROJECT LENGTH = 1.429 MILES
220284 720 STP-212D(065)CI 52 0 CHOCTAW
BRIDGE AND APPROACHES COUNTY ROAD (EW-209): OVER ROCK CREEK, 7.2 MILES EAST OF THE US-271 JUNCTION NEAR SAWYER. PROJECT LENGTH = 0.151 MILE
220285 725 NHPP-017N(282)PM 92 2 CIMARRON
GRADE, DRAIN, SURFACE, AND BRIDGE US-287: FROM 11.5 MILES NORTH OF THE US-412 JUNCTION, EXTEND NORTH NEAR BOISE CITY. PROJECT LENGTH = 3.862 MILES
220286 730 STP-216F(107)3B 45 1 COMANCHE
JOINT SEAL/REPAIR US-62/US-277: US-62, OVER QUANAH PARKER TRAILWAY 6.8 MILES WEST OF I-44 IN LAWTON. US-277, OVER EAST CACHE CREEK 1.2 MILES EAST OF THE US-62 JUNCTION NEAR ELGIN. PROJECT LENGTH = 0.00 MILE
220287 735 STP-217D(052)CI 59 1 COTTON
BRIDGE AND APPROACHES COUNTY ROAD (EW-190): OVER DEEP RED CREEK, 2.4 MILES WEST OF THE US-277 JUNCTION NEAR COOKIETOWN. PROJECT LENGTH = 0.206 MILE
220288 740 STP-125B(115)PM 137 1 GARVIN PONTOTOC
WIDEN, RESURFACE, AND BRIDGE SH-19: FROM 1.0 MILE EAST OF THE US-177 JUNCTION, EXTEND EAST NEAR STRATFORD. PROJECT LENGTH = 4.661 MILE
220289 745 STP-125D(154)CO 43 0 GARVIN
BRIDGE AND APPROACHES COUNTY ROAD (EW-159): OVER TRIBUTARY TO WASHITA RIVER, 5.5 MILES WEST OF THE US-177 JUNCTION NEAR WYNNEWOOD. PROJECT LENGTH = 0.114 MILE
220290 750 STP-236F(103)3B 45 1 KAY
JOINT SEAL/REPAIR I-35/US-177: I-35, OVER SALT FORK OF ARKANSAS RIVER O'FLOW 5.2 MILES NORTH OF THE NOBLE COUNTY LINE NEAR TONKAWA. US-177, OVER STINK CREEK 3.2 MILES NORTH OF THE US-60 JUNCTION NEAR TONKAWA. PROJECT LENGTH = 0.00 MILE
220331 752 HSIPG-3500(143)TR 26 0 KAY LOGAN NOBLE PAYNE
SAFETY IMPROVEMENTS (DELINEATION AND WRONG WAY MITIGATION) I-35: FROM THE OKLAHOMA COUNTY LINE, EXTEND NORTH. PROJECT LENGTH = 89.00 MILES
220291 755 STP-238F(084)3B 49 0 KIOWA
JOINT SEAL/REPAIR US-62: OVER OTTER CREEK AND OTTER CREEK O'FLOW, 0.2 MILES AND 0.3 MILES EAST OF THE TILLMAN COUNTY LINE. PROJECT LENGTH = 0.00 MILE
220292 760 TAP-249E(057)TP 108 0 MAYES
PEDESTRIAN AND BIKE IMPROVEMENTS CITY STREETS (BEATY ST/HARRISON AVE/ MAIN ST/MCCRACKEN ST/OLNEY AVE/RAILROAD ST): AT MULTIPLE LOCATIONS IN THE TOWN OF CHOUTEAU. PROJECT LENGTH = 1.550 MILES
220293 765 SBR-3500(123)SB 56 1 MURRAY
BRIDGE REHABILITATION I-35: OVER US-77, 1.6 MILES NORTH OF THE CARTER COUNTY LINE NEAR TURNER FALLS PARK. PROJECT LENGTH = 0.00 MILE
220294 770 SBR-251N(142)SB 87 1 MUSKOGEE
BRIDGE REHABILITATION US-62: OVER SH-165, 1.7 MILES EAST OF SH-16 IN MUSKOGEE. PROJECT LENGTH = 0.000 MILE
220295 775 STP-252F(087)PM 104 1 GARFIELD GRANT KAY NOBLE
BRIDGE WATER PROOF SEAL US-60/US-81/US-412/SH-11/SH-74/SH-132: AT MULTIPLE LOCATIONS IN DIVISION IV. PROJECT LENGTH = 0.00 MILE
210299 780 STP-254B(055)PM 125 1 OKFUSKEE
WIDEN, RESURFACE, AND BRIDGE US-75: FROM I-40, EXTEND SOUTH NEAR CLEARVIEW. PROJECT LENGTH = 2.9526 MILES
220296 785 STP-254D(058)CI 50 0 OKFUSKEE
BRIDGE AND APPROACHES COUNTY ROAD (EW-102): OVER WALNUT CREEK, 0.6 MILES WEST OF THE SH-48 JUNCTION NEAR BOLEY. PROJECT LENGTH = 0.433 MILE
220297 790 NHPPI-4000-(126)PM 591 1 OKLAHOMA
GRADE, DRAIN, SURFACE, AND BRIDGE I-40: FROM THE DOUGLAS BOULEVARD INTERCHANGE, EXTEND SOUTHEAST IN MIDWEST CITY AND OKLAHOMA CITY. PROJECT LENGTH = 5.969 MILES
220260 795 TAP-255D(578)AG 34 1 OKLAHOMA
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) CITY STREETS (NW 40TH ST/ NW 49TH ST/NW 50TH ST/NW 58TH ST/ NW 63RD ST): AT MULTIPLE LOCATIONS IN THE CITY OF WARR ACRES. PROJECT LENGTH = 1.946 MILES
220298 800 STP-255D(570)CO 43 0 OKLAHOMA
BRIDGE AND APPROACHES COUNTY ROAD (N. 108TH STREET): OVER UNNAMED CREEK, 6.5 MILES EAST OF I-44 IN JONES. PROJECT LENGTH = 0.263 MILE
220299 805 NHPP-264N(090)PM 115 1 PUSHMATAHA
BRIDGE AND APPROACHES SH-3: OVER KIAMICHI RIVER, 7.5 MILES SOUTHEAST OF THE US-271 JUNCTION NEAR ANTLERS. PROJECT LENGTH = 0.630 MILE
220300 810 STP-267D(096)CI 48 0 SEMINOLE
BRIDGE AND APPROACHES COUNTY ROAD (EW-116): OVER TURKEY CREEK, 1.5 MILES WEST OF THE US-377/SH-99 JUNCTION NEAR SEMINOLE. PROJECT LENGTH = 0.143 MILE
220301 815 STP-268C(084)PM 95 1 SEQUOYAH
BRIDGE AND APPROACHES SH-101: OVER BIG SKIN BAYOU, 7.6 MILES EAST OF THE US-59 JUNCTION NEAR SALLISAW. PROJECT LENGTH = 0.527 MILE
220302 820 STP-270F(047)3B 26 1 BEAVER TEXAS
JOINT SEAL/REPAIR US-54/US-270: US-54, OVER BEAVER RIVER 5.9 MILES NORTHEAST OF THE SH-3 JUNCTION NEAR GUYMON. US-270, OVER DUCK POND CREEK 5.9 MILES EAST OF THE SH-23 JUNCTION NEAR ELMWOOD. PROJECT LENGTH = 0.00 MILE
220303 825 SSP-NBIP(542)PM 38 1 TULSA
BRIDGE PAINTING I-244 EB/I-244 RAMP E-N/US-64/US-75 RAMP N-E/ GILCREASE EXP. RAMP/SH-11 EB TO I-244 EB/ SH-51/PEORIA AVE/PINE ST: AT MULTIPLE LOCATIONS IN DIVISION VIII. PROJECT LENGTH = 0.00 MILE
220304 830 SSP-272F(354)PM 65 1 DELAWARE MAYES OSAGE OTTAWA
BRIDGE WATER PROOF SEAL I-44/US-64/US-75/SH-11/SH-20/SH-51: AT MULTIPLE LOCATIONS IN DIVISION VIII. PROJECT LENGTH = 0.00 MILE
220305 835 SSP-272F(352)PM 147 1 DELAWARE MAYES OTTAWA ROGERS
JOINT SEAL/REPAIR US-59/US-412/US-412 ALT/SH-66: AT MULTIPLE LOCATIONS IN DIVISION VIII. PROJECT LENGTH = 0.000 MILE
220306 840 STP-272B(368)AD 47 0 TULSA
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) SH-97: FROM THE INTERSECTION OF N. WILSON AVENUE AND W. 2ND STREET, EXTEND EAST ON 2ND STREET THEN NORTH ON N. MCKINLEY AVENUE IN SAND SPRINGS. PROJECT LENGTH = 1.02 MILES
220307 845 NHPP-272N(356)PM 179 0 TULSA
INTERCHANGE US-64 (MEMORIAL DRIVE): AT THE US-169 INTERCHANGE IN TULSA. PROJECT LENGTH = 0.974 MILE
220308 850 NHPP-018N(083)PM 68 2 WASHINGTON
BRIDGE REHABILITATION US-60: OVER US-75, 3.9 MILES EAST OF THE SH-123 JUNCTION IN BARTLESVILLE. PROJECT LENGTH = 0.110 MILE

Error

Bid Express: New Roads

Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.

Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.

Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.

No thanks