New Try the new experience
The new Bid Express experience is available for this page. Learn more. Maybe later

The letting has ended.
Downloads

Letting of May 19, 2022

Letting information table
Letting ID: 22051901
District ID: ODOT
Cut-Off Time: 10:30:59 AM CDT
   

Proposal table
Proposal Call Order Project ID Items Amendments Counties
(25 Active Proposals, 1 Withdrawn Proposal)
220188 437 This proposal has been withdrawn
This proposal has been moved to the letting of
220160 420 NHPP-211N(062)PM 100 1 CHEROKEE
INTERSECTION MODIFICATION US-62: FROM 0.2 MILES SOUTH OF THE SH-82 JUNCTION, EXTEND NORTH NEAR TAHLEQUAH. PROJECT LENGTH = 1.429 MILES
210247 430 STP-214B(111)PM 70 1 CLEVELAND
BRIDGE AND APPROACHES SH-37: OVER UNNAMED CREEK, 0.4 MILES WEST OF I-35 IN MOORE. PROJECT LENGTH = 0.029 MILE
220120 435 TAP-214E(102)AG 71 1 CLEVELAND
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) CITY STREET (CONSTITUTION STREET): FROM JENKINS AVENUE, EXTEND EAST IN NORMAN. PROJECT LENGTH = 1.040 MILES
220016 445 NHPPI-4000-(150)PM 45 1 CUSTER
BRIDGE AND APPROACHES I-40 SOUTH FRONTAGE ROAD: OVER DRY CREEK, 5.8 MILES NORTHEAST OF THE WASHITA COUNTY LINE NEAR CLINTON. PROJECT LENGTH = 0.066 MILE
220163 455 STP-226B(104)PM 87 1 GRADY MCCLAIN
GRADE, DRAIN, AND SURFACE SH-39: FROM 2.9 MILES WEST OF THE SH-76 JUNCTION, EXTEND EAST NEAR DIBBLE. PROJECT LENGTH = 2.75 MILES
220166 480 STP-239B(042)AD 42 1 LATIMER
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) US-270/SH-2: US-270, FROM 0.4 MILES SOUTHWEST OF THE SH-2 JUNCTION EXTEND NORTHEAST IN WILBURTON. SH-2, FROM THE US-270 JUNCTION EXTEND NORTHWEST IN WILBURTON. PROJECT LENGTH = 0.937 MILE
220167 485 STP-242C(102)3P 36 0 LOGAN
RESURFACE (ASPHALT) SH-74: FROM THE SH-33 JUNCTION, EXTEND NORTH NEAR CRESCENT. PROJECT LENGTH = 5.240 MILES
220168 490 NHPPI-3500-(133)PM 13 1 MCCLAIN
RESURFACE (ASPHALT) I-35: FROM 3.9 MILES SOUTHEAST OF THE SH-9 INTERCHANGE, EXTEND NORTHWEST IN GOLDSBY. PROJECT LENGTH = 4.320 MILES
220169 495 NHPPI-3500-(128)PM 110 1 MURRAY
BRIDGE AND APPROACHES I-35 SOUTHBOUND: OVER SH-77D, 0.5 MILES SOUTHEAST OF THE US-77 INTERCHANGE NEAR DAVIS. PROJECT LENGTH = 0.467 MILE
220170 500 SBR-251F(140)SB 27 0 ADAIR MCINTOSH MUSKOGEE
BRIDGE PAINTNG US-64/SH-51/COUNTY ROAD 4210: OVER US-64, EVANSVILLE CREEK AND I-40 AT MULTIPLE LOCATIONS IN DIVISION 1. PROJECT LENGTH = 0.00 MILE
220171 505 STP-155E(920)EH 23 1 OKLAHOMA
PEDESTRIAN IMPROVEMENTS (BIKE LANE AND STRIPING) CITY STREETS (OKC WATCH 4 ME): AT MULTIPLE LOCATIONS IN OKLAHOMA CITY. PROJECT LENGTH = 13.71 MILES
220172 510 TAP-255D(326)AG 51 0 OKLAHOMA
PEDESTRIAN IMPROVEMENTS (TRAIL CONSTRUCTION) PALMER LOOP TRAIL ELEMENTARY SCHOOL CONNECTOR: FROM MIDWEST BOULEVARD, EXTEND EAST IN THE CITY OF MIDWEST CITY. PROJECT LENGTH = 0.070 MILE
220174 520 NHPPI-3500-(108)PM 24 0 OKLAHOMA
RESURFACE (ASPHALT) I-35:FROM 0.4 MILES NORTH OF SH-66, EXTEND NORTH IN EDMOND. PROJECT LENGTH = 4.680 MILES
220175 525 NHPPI-4000-(159)PM 28 0 OKLAHOMA
RESURFACE (ASPHALT) I-40: FROM 3.5 MILES SOUTHEAST OF THE I-35 INTERCHANGE, EXTEND EAST IN MIDWEST CITY. PROJECT LENGTH = 3.650 MILES
220176 530 NHPP-257N(084)PM 37 1 OSAGE
PAVEMENT REHABILITATION (ASPHALT) US-60: FROM 7.71 MILES EAST OF SH-18 JUNCTION, EXTEND EAST NEAR PAWHUSKA. PROJECT LENGTH = 6.150 MILES
220238 532 SSR-261C(109)SR 12 0 PITTSBURG
RESURFACE (ASPHALT) SH-31: FROM 4.0 MILES EAST OF THE US-270 JUNCTION, EXTEND NORTH NEAR KREBS. PROJECT LENGTH = 18.51 MILES
220177 535 SSP-262F(077)PM 33 0 CLEVELAND GARVIN MCCLAIN PONTOTOC
BRIDGE WATER PROOF SEAL I-35/US-77/SH-9/34TH STREET/LADD ROAD: AT MULTIPLE LOCATIONS IN DIVISION III. PROJECT LENGTH = 0.000 MILE
220178 540 SSP-NBIP(539)PM 23 0 POTTAWATOMIE
BRIDGE PAINTING US-270/SH-102: OVER WYNNEWOOD CREEK, SOUTH DEER CREEK, AND SH-9 AT MULTIPLE LOCATIONS IN DIVISION III. PROJECT LENGTH = 0.00 MILE
220179 545 SSP-262F(076)PM 113 0 COAL PONTOTOC POTTAWATOMIE
JOINT SEAL/REPAIR I-40/US-270/SH-3/KICKAPOO (FAS 6329): AT MULTIPLE LOCATIONS IN DIVISION III. PROJECT LENGTH = 0.000 MILE
220239 546 SSR-264C(087)SR 17 0 PUSHMATAHA
RESURFACE (ASPHALT) SH-2: FROM THE SH-3 JUNCTION, EXTEND NORTH NEAR ANTLERS. PROJECT LENGTH = 7.56 MILES
220240 547 SSR-264C(088)SR 14 0 PUSHMATAHA
RESURFACE (ASPHALT) SH-2: FROM 13.7 MILES NORTH OF THE SH-3 JUNCTION, EXTEND NORTH NEAR ANTLERS. PROJECT LENGTH = 9.73 MILES
220241 548 SSR-264C(089)SR 16 0 PUSHMATAHA
RESURFACE (ASPHALT) SH-2: FROM 23.7 MILES NORTH OF THE SH-3 JUNCTION, EXTEND NORTH NEAR CLAYTON. PROJECT LENGTH = 9.58 MILES
220242 549 SSR-264C(088)SR 45 0 PUSHMATAHA
RESURFACE (ASPHALT) SH-2: FROM THE SH-3 JUNCTION, EXTEND NORTH NEAR ANTLERS. PROJECT LENGTH = 26.87 MILES
220180 550 NHPPI-4000-(127)PM 24 1 SEQUOYAH
PAVEMENT REHABILITATION (P.C. CONCRETE) I-40:FROM 3.0 MILES NORTHWEST OF THE US-64, EXTEND SOUTHEAST NEAR MULDROW. PROJECT LENGTH = 5.376 MILES
220187 555 SAP-028N(006)ES 19 0 TULSA
BRIDGE REPAIR CITY STREET (NEW HAVEN AVENUE): REPAIR VEHICLE IMPACT DAMAGE OVER SH-11, 1.0 MILE EAST OF US-75 IN TULSA. PROJECT LENGTH = 0.000 MILE

Error

Bid Express: New Roads

Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.

Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.

Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.

No thanks