Questions for Proposal 17602

Header information table
Letting ID: 18011801 Call Order: 602
Questions for this proposal
Subject Number Asked Answered
(15 Questions)
Ethernet Switch Type B - Special Provisions Page 100 specifies "All Type B switches are to be Cisco-... 1 01/02/2018 08:24 AM 01/14/2018 03:02 PM
Fiber optic cable - ITS drawings show REMOVE ABANDONED FOC. Can this be removed the same time the ne... 2 01/06/2018 02:33 PM 01/14/2018 03:02 PM
Traffic signal maintenance - What duration shall the contractor expect to assume responsibility of m... 3 01/06/2018 02:42 PM 01/14/2018 03:03 PM
video detection - can the existing video detectors be removed at time of new detector installation? 4 01/06/2018 02:46 PM 01/14/2018 03:03 PM
Existing Communication Conduits - Shall we assume the existing communication conduits have existing ... 5 01/06/2018 02:47 PM 01/14/2018 03:03 PM
Traffic signal shutdown - Will State Police be provided for traffic signal 'black' time during contr... 6 01/06/2018 02:50 PM 01/14/2018 03:03 PM
System shutdown - Spec 704.03.01 B specifies "allowable time frame for existing system shutdown will... 7 01/06/2018 02:52 PM 01/14/2018 03:03 PM
Testing of Radar Detector - 704.03.04.B.4iii refers to testing of System Detector, Type Radar to be ... 8 01/06/2018 02:53 PM 01/14/2018 03:03 PM
Fiber optic trunk cable installation - Plans show @90,000 lf type G fiber optic cable to be installe... 9 01/06/2018 04:09 PM 01/14/2018 03:03 PM
Existing conduit entry into existing 38" Rd JBs - Are as-builts available showing conduit entry posi... 10 01/07/2018 07:57 AM 01/14/2018 03:04 PM
3"RMC across bridge - PS ITS-79 depicts proposed 3" RMC across Rt295 as if it is to be installed exp... 11 01/08/2018 11:02 AM 01/14/2018 03:04 PM
System Requirements Matrix - If an adaptive software not meet all of the requirements in the System ... 12 01/08/2018 03:18 PM 01/14/2018 03:04 PM
Detector Numbering - Would the NJDOT accept an alternate numbering convention for the midblock detec... 13 01/08/2018 03:21 PM 01/14/2018 03:04 PM
CTSS Controller Unit - PS E-09 shows the INSTALL: CONTROLLER MODIFICATIONS, TYPE CTSS; CTSS CONTROLL... 14 01/09/2018 08:11 PM 01/14/2018 03:04 PM
3" Rigid Metallic Conduit Over Route 295 - In reference to Plan Sheet No. 194 (Dwg No. ITS-79) pleas... 15 01/12/2018 02:20 PM 01/14/2018 03:05 PM