Payment - Please refer to the NJDOT Standard Specification for the incremental mobilization payment ... 4 02/15/2018 04:32 PM 03/12/2018 07:16 AM
Construction Loading Limitations - Please refer to drawing sheet No. B7, Note 22 for Construction lo... 5 02/15/2018 04:57 PM 03/12/2018 07:16 AM
Temporary Shielding - Temporary shielding is present at the bridge spans 47 and 97. Will the shield ... 6 02/15/2018 04:58 PM 03/12/2018 07:16 AM
Specification Section 502.03.06 - Page 58 of 137 of Specification Section 502.03.06 Paragraph C 1, r... 7 02/15/2018 04:59 PM 03/12/2018 07:17 AM
Structural Steel Weight - Refer to drawing sheet no.179. Structural steel weight of 14,100lbs shown ... 8 02/15/2018 04:59 PM 03/12/2018 07:17 AM
Jacking & Truss Deflection - Refer to drw.sheet 69. Jacking and truss deflection monitoring activiti... 9 02/15/2018 05:00 PM 03/12/2018 07:17 AM
Railroad Insurance - Please clarify if this project requires Railroad Protective Liability Insurance... 10 02/15/2018 05:01 PM 03/12/2018 07:17 AM
Contract Time - Please reference the Project Presentation and Section 108.10 CONTRACT TIME of the Sp... 11 02/15/2018 05:02 PM 03/26/2018 01:14 PM
Contract Review Time - The New Jersey standard specification allows 45 working days to review, appro... 12 02/15/2018 05:02 PM 03/12/2018 07:18 AM
TCC - Given the project scope and project parameters, will NJDOT require a named TCC to be on the co... 13 02/15/2018 05:03 PM 03/12/2018 07:18 AM
Liquidated Damages - As per the standard specification table 108.11.011, there is an inordinate amou... 14 02/15/2018 05:03 PM 03/26/2018 01:14 PM
Temp Internal Bracing - Please refer to drawing sheet 176. Please confirm that the temporary interna... 15 02/15/2018 05:04 PM 03/12/2018 07:18 AM
Rivet Replacement - Please refer to sheet 62, Biditem 558005P (Rivet Replacement). Is this item a â€... 16 02/15/2018 05:05 PM 03/12/2018 07:18 AM
Temporary Shielding Span 47 - In regard to the limits for Pay Item #83, Temporary Shielding. We cann... 17 02/21/2018 01:13 PM 03/12/2018 07:18 AM
Coordination with Structural Instrumentation Vendor - Refer to drawing B-126, note #2 & #3, which re... 18 02/21/2018 01:27 PM 03/26/2018 01:13 PM
Item 155019 Field Office Type G - Refer to Standard Specification, Section 155.03.01 Office Size Req... 19 02/21/2018 01:30 PM 03/12/2018 07:18 AM
Bid Items #86 & #115 - Regarding the plan estimated quantities for Pay Item #115, Structural Steel R... 20 03/13/2018 07:33 AM 03/26/2018 01:13 PM
Compression Tests - The micropile proof tests at Rocker Bent 47 are to be performed as compression a... 21 03/15/2018 12:50 PM 03/26/2018 01:14 PM
Boring Logs - Please provide boring logs H-B-14 and H-B-27 that were not included in the original bo... 22 03/15/2018 12:54 PM 03/26/2018 01:13 PM
Strain Gauges - Please confirm that the strain gauges and shape accelarray are only required for the... 23 03/15/2018 12:57 PM 03/26/2018 01:14 PM
Micropiles @ Bents 47 & 97 - Please confirm that Mill Secondary casing cannot be used for all of the... 24 03/15/2018 12:58 PM 03/26/2018 01:14 PM
Temp Lateral Bracing - Please refer to drawings B22 (sheet 81) and B23 (sheet 82 Section C & E). Th... 25 03/16/2018 03:33 PM 03/26/2018 01:15 PM
Exist Truss Members - Please refer to drawing B24 (sheet 83). Please provide the as-built reference... 26 03/16/2018 03:33 PM 03/26/2018 01:15 PM
Struct Steel Repair Type 1 - Please refer to drawing B29 (sheet 88). Bid item 506041P “Structural... 27 03/16/2018 03:34 PM 03/26/2018 01:15 PM
Temp Shield - 1. Please refer to drawing B24 (sheet 83). What are the limits of the temporary shiel... 28 03/16/2018 03:36 PM 03/26/2018 01:15 PM
Exist Power Lines - There are existing power lines along the Pulaski Skyway at Span 47. Will these ... 29 03/16/2018 03:37 PM 03/26/2018 01:15 PM
Item 88 Steel Repair Type A - Please define the work area limits for Item 88, Steel Repair Type A, r... 30 04/10/2018 03:40 PM 04/25/2018 12:08 PM
Locations of Additional Steel Repairs - For both Span #47 and Span #97 various steel repair items ar... 31 04/10/2018 03:54 PM 04/25/2018 12:09 PM
Structural Steel Material - Refer to Sheet 67(B8 of B127/DWG:47-3): Structural Steel Notes: Note 2... 32 04/17/2018 03:44 PM 04/25/2018 12:09 PM
Batten Plates - Please refer to drawing B-76 (sheet 135). Sections D-D and E-E show ½â€ batten pl... 33 04/19/2018 12:00 PM 04/25/2018 12:09 PM
Insurance - Please refer to section 152.03.01.A of the NJDOT Standard Specfications. Will NJDOT con... 34 05/01/2018 01:20 PM 06/08/2018 10:07 AM
Specification Section 108.10 Completion Dates - Please reference Specification Section 108.10 CONTRA... 35 05/04/2018 08:16 AM 06/08/2018 10:08 AM