Proposal 11015-123135

Bridge rehabilitation including deep overlay, structural steel work, substructure repair, barrier replacement and approach work on 5 structures over I-94, Berrien County. This project includes a 5 year overlay performance warranty, a 2 year bridge painting warranty and a 2 year concrete surface coating warranty. ** 6592 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N4. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
Proposal information table
Date Generated:01/02/2018Sections: 2
Date Revised: 01/02/2018 Amendments: 2
Call Order: 040 Highway Number:
Items: 243 Counties: Berrien County
Project ID: 1800151

You must be logged in to view item data.