Proposal 20121210216 |
For the work of lowering US-2 under the BNSF Railway
bridge, widening the roadway from three lanes to four
lanes. Includes asphalt paving, earthwork, grading,
drainage, guardrail, MSE retaining walls, a soldier pile
wall, utility relocation coordination, temporary shoring
and construction traffic control
Date Generated: | 01/09/2023 | Sections: | 1 |
Date Revised: | 02/14/2023 | Amendments: | 1 |
Call Order: | 4 | Highway Number: | 0015 |
Items: | 76 | Counties: | Bonner |
Project ID: | A020(121)/20121 |