For the work of lowering US-2 under the BNSF Railway
bridge, widening the roadway from three lanes to four
lanes. Includes asphalt paving, earthwork, grading,
drainage, guardrail, MSE retaining walls, a soldier pile
wall, utility relocation coordinati...
23343221114
1
This proposal has been withdrawn
This proposal has been moved to the letting of March 14, 2023
For the work of widening the roadway cross section from 2
to 3 lanes and widening shoulders to be used as right turn
movements. This project is located on SH-53 between mile
points 8.37 and 9.3.
Error
Bid Express: New Roads
Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.
Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.
Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.
Easy on the eyes A cleaner look and simplified layout makes it easier to locate the things you need and get more work done.
Find opportunities faster Streamlined navigation and powerful new search and filtering tools to speed up your workflow.
Plan for some lane changes Some links will send you back to classic Bid Express. Learn more.