Proposal E4S85

LETTING LOCATION: D4 Procurement Conference Room, POSTING DATES: 12/19/2017 and 12/26/2017 CONTRACT DAYS: 195 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 15 Calendar Days The Improvements under this Contract consist of milling and resurfacing, monitoring existing structures, drainage improvements, curb and gutter, pedestrian and bicycle railing, concrete sidewalk and driveways, patterned pavement, concrete ditch pavement, guardrail, traffic monitoring sites, signing and pavement markings, signalization, vehicle and pedestrian detection, and lighting along State Road 5 (US-1/Federal Highway) from 0.055 miles southeast of SE Brook Street/Sunshine Manor northwesterly 1.610 miles to 0.126 miles northwest of SE Fischer Street, mostly within the City of Stuart in Martin County. Contractor must be pre-qualified.
Proposal information table
Date Generated:10/06/2017Sections: 4
Date Revised: Amendments: 0
Call Order: 002 Highway Number: 8901
Items: 130 Counties: MARTIN
Project ID: N/A