Proposal C20945

The scope of work consists of a 3-4" mill and overlay from Lemay to I-25, full depth turn lane widenings, full depth road reconstruction on eastbound SH 14 from Timberline to Summitview, detour paving, ADA curb ramp replacements, cable rail section in median, reset pull box's, culvert extension, signal work, signing and striping.
Proposal information table
Date Generated:12/29/2017Sections: 1
Date Revised: 12/29/2017 Amendments: 1
Call Order: 005 Highway Number:
Items: 126 Counties: LARIMER
Project ID: STA0142-065

December 22, 2017 01:29 PM MST

STA 0142-065

PROJECT CODE: 20945

RESURFACING

 

 

NOTICE TO CONTRACTORS

 

NOTICE IS HEREBY GIVEN TO A DEFERMENT IN THE BID OPENING IN COLORADO ONTHE FOLLOWING PROJECT.

 

PROJECT NO.:          STA 0142-065

PROJECT CODE:          20945

LOCATION:               SH 14 RESURFACING FT. COLLINS, LEMAY TO I-25

 

BIDS FOR THIS PROJECTMUST BE ELECTRONICALLY SUBMITTED ON BID EXPRESS PRIOR TO 10:00 A.M., JANUARY 11, 2018 (CALL ORDER #5) INSTEAD OF JANUARY 4, 2018 (CALL ORDER #2).

  

MICHAEL KEEN

PROJECT MANAGER


NO AMENDMENT FILE REQUIRED

 

This project had revisions made to the bid schedule which occurred after the deferral of the bid opening. 

 

A new letting number for the project was created due to the deferral.   Therefore, the new bid schedule which was generated for the project incorporated the schedule revisions into a single EBS file which is posted for the project.  

You must be logged in to view item data.