Proposal C20842

THIS PROJECT IS LOCATED WITHIN ROUTT AND GRAND COUNTY, ALONG US 40. PROJECT LIMITS BEGIN AT MP 135.1 AND CONTINUE EAST TO MP 152.4, CONSTRUCTION FOR SURFACE TREATMENT AND SIGNAGE WILL BE FROM MP 135.3 TO MP 147.5. CONSTRUCTION LIMITS FOR THE CULVERT REPLACEMENT, AT MP 151.92, WILL BE FROM MP 151.4 TO MP 152.4. THERE IS A NO WORK ZONE FROM MP 147.5 TO MP 151.4. THE PROJECT WORK INCLUDES A 2.5" MILL AND 2" FILL SURFACE TREATMENT, GUARDRAIL REPLACEMENT, SIGN MODIFICATIONS, CULVERT REPLACEMENT, SEDIMENT CONTROL, FROST HEAVE REPAIRS, PAVEMENT MARKING, AND TRAFFIC CONTROL. A non-mandatory pre-bid conference will be held on Thursday, December 7, 2017, beginning at 10:00 am at the CDOT conference rooms located in Craig at 270 Ranney Street and in Glenwood Springs at 202 Centennial Street. Attendance is recommended given the variety of work. The pre-bid conference will also be available remotely via a combination of teleconference and a web-based presentation (Zoom). To participate remotely, email Clint Moyer (clint.moyer@state.co.us) and Cole Rising (cole.rising@state.co.us) with your contact information, including email address and phone number, by close of business on Tuesday, December 5, 2017. You will then be sent remote connection instructions in advance of the pre-bid conference.
Proposal information table
Date Generated:12/20/2017Sections: 1
Date Revised: Amendments: 0
Call Order: 008 Highway Number:
Items: 119 Counties: ROUTT GRAND
Project ID: NHPP0402-092

December 20, 2017 12:38 PM MST

NHPP 0402-092

PROJECT CODE: 20842

2.5” MILL AND 2” AND CULVERT REPAIR AT MP 151.9

 

 

NOTICE TO CONTRACTORS

 

 

NOTICE IS HEREBY GIVEN TO A DEFERMENT IN THE BID OPENING IN COLORADO ONTHE FOLLOWING PROJECT. A REVISION WILL FOLLOW

 

PROJECT NO.:          NHPP 0402-092

PROJECT CODE:          20842

LOCATION:               US 40 RABBIT EARS WEST

 

BIDS FOR THIS PROJECTMUST BE ELECTRONICALLY SUBMITTED ON BID EXPRESS PRIOR TO 10:00 A.M., JANUARY 4, 2018 (CALL ORDER #8) INSTEAD OF DECEMBER 21, 2017 (CALL ORDER #3).


BART NECESSARY

PROJECT MANAGER


NO AMENDMENT FILE REQUIRED

 

This project had revisions made to the bid schedule which occurred after the deferral of the bid opening. 

 

A new letting number for the project was created due to the deferral.   Therefore, the new bid schedule which was generated for the project incorporated the schedule revisions into a single EBS file which is posted for the project. 

 

You must be logged in to view item data.