New Try the new experience
The new Bid Express experience is available for this page. Learn more. Maybe later

The letting has ended.

Letting of February 16, 2023

Letting information table
Letting ID: 20230216
Cut-Off Time: 10:00:01 AM MDT
   

Proposal table
Proposal Call Order Project ID Items Amendments Counties
(10 Active Proposals)
C24667 001 C0703-498 93 1 CLEAR CREEK SUMMIT
EISENHOWER JOHNSON MEMORIAL TUNNEL EJMT Service Area Repairs-Various paving, guardrail improvements, and masonry improvements on the service loop roads around the facility and on the approach to the tunnels. Addition of an anti-icing system at the por...
C22465 002 STA1381-011 98 1 LOGAN
THIS PROJECT CONSISTS OF WIDENING AND OVERLAYING SH 138 BETWEEN STERLING AND ILIFF WITH EMBANKMENT MATERIAL, ABC CLASS 6, AND HOT MIX ASPHALT. CULVERT REPLACEMENTS, SCOUR REPAIR, AND BRIDGE RAIL AND GUARDRAIL UPGRADES ARE ALSO INCLUDED. NEW SIGNAGE, S...
C24279 003 C133A-052 68 0 PITKIN
SH 133 ROCKFALL NORTH OF MCCLURE PHASE 2 THIS PROJECT CONSISTS OF RCKFALL MITIGATION AT FOUR SITES ON SH133 IN PITKIN COUNTY. ROCKFALL MITIGATION WILL INCLUDE ROCK SCALING AND STABILIZATION, ROCK AND UNCLASSIFIED EXCAVATION, ROCKFALL WIRE MESH INSTALL...
C23191 004 C1601-084 90 0 LA PLATA RIO GRANDE MONTEZUMA ARCHULETA
US 160 Section 3 Priority Culverts is a culvert repair and replacement project. The scope of this project is to replace three existing culvert structures and repair six culvert inverts alongUS 160 from MM 49.48 to MM 184.65. Project is to include, but...
C24772 005 C 1601-086 72 0 MONTEZUMA
EXISTING SIGNAL REPLACEMENT US 160 AT CO 145 AND US 160 AT CHESTNUT IN CORTEZ CO. TWO CURB RAMPS AT CO 145.
C23064A 006 STM C440-013 50 0 EAGLE
US 6 MM 150-151,I-70 MM 159.5-160.5,167.8-168.8,174.5-176.5
C23064B 007 STM C440-013 49 0 EAGLE
US 6 MM 150-151,I-70 MM 159.5-160.5,167.8-168.8,174.5-176.5
C23064C 008 STM C440-013 49 0 EAGLE
US 6 MM 150-151,I-70 MM 159.5-160.5,167.8-168.8,174.5-176.5
C25120 009 NHPP0701-256 72 0 MESA
I-70B/31.5 RD MESA COUNTY The project is a traffic safety improvement project that consists of lengthening the existing westbound left turn lane on I 70B along with installing three pedestrian push buttons on three of the four corner ramps, installing...
C24878 010 C0881-036 68 0 DENVER ARAPAHOE JEFFERSON
Project will consist of replacing approximately 207 curb ramps to comply with Federal ADA standards.

Error

Bid Express: New Roads

Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.

Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.

Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.

No thanks