The letting has ended.

Letting of December 21, 2017

Letting information table
Letting ID: 20171221
Cut-Off Time: 10:00:01 AM MDT
   

Proposal table
Proposal Call Order Project ID Items Amendments Counties
(4 Active Proposals, 4 Withdrawn Proposals)
C21736 002 STR139A-034 59 1 GARFIELD
LOCATED ON US 139 IN GARFIELD COUNTY BEGINNING AT MM 19.0 AND EXTENDING NORTH APPROXIMATELY 12.0 MILES TO MM 31.0 THE WORK CONSISTS OF RESURFACING, INCLUDING HOT-IN-PLACE RECYCLING TREATMENT OF THE DRIVING LANES, 1.5 INCH FULL-WIDTH HMA OVERLAY, SHOUL...
C20257-COMBO 006 ERR400-328 52 0 LOGAN MORGAN SEDGWICK
FLOOD SCOUR REPAIR AT STRUCTURES ON SH 52, SH 6, SH 63, SH 55, SH 59, AND SH 385. WORK CONSISTS OF DEWATERING AND PLACING RIP RAP AT LOCAL ABUTMENT AND PIER LOCATIONS. CULVERT REPAIR ON SH 63 AND SH 55 ALSO INCLUDED.
C20750 007 STA050A-027 48 0 PUEBLO
The project work entails installation of new Storm Sewer, inlets, manholes, asphalt patching and other as described in the plans and specs. The limits of the project are US 50C from 20th Lane to 21st Lane, then running north on 21st lane terminating a...
C21262 007 This proposal has been withdrawn
PROJECT DEFERRED TO JANUARY 4, 2018
C20842 008 This proposal has been withdrawn
PROJECT DEFERRED TO JANUARY 4, 2018
C21862 008 FSA0361-122 17 0 YUMA LINCOLN PHILLIPS SEDGWICK
CENTER LINE RUMBLE STRIP INSTALLATION ON US HIGHWAYS 40, 287 AND 385 AND SHOULDER RUMBLE STRIP INSTALLATION AT ONE RAMP LOCATION ON I-70. INCLUDES CENTERLINE MARKING REAPPLICATION. WORK IS LOCATED IN CHEYENNE, LINCOLN, PHILLIPS, SEDGWICH AND YUMA COUN...
C20737 009 This proposal has been withdrawn
PROJECT DEFERRED TO JANUARY 4, 2018
C20180-COMBO 010 This proposal has been withdrawn
PROJECT DEFERRED TO JANUARY 4, 2018