Proposal 2017042

The proposed project is located in Pinal County and the City of Apache Junction on SR 88, starting at SR 88 MP 196.05 and ending at MP 196.69. The proposed work consists of removing the existing intersection and constructing a new roundabout at the intersection of SR 88 and Superstition Boulevard and pavement rehabilitation and ADA improvements at the intersection of SR 88 and Idaho Road. The work includes roadway excavation, embankment, milling the existing asphaltic concrete pavement, furnishing and placing asphaltic concrete and asphaltic concrete friction course, constructing curb, gutter, sidewalk, sidewalk ramps, driveways, catch basins, spillways, and concrete lined channel, installing storm drains, culverts, and roadway lighting, placing riprap, pavement marking and signing, modifying traffic signals, and other related work.
Proposal information table
Date Generated:10/06/2017Sections: 1
Date Revised: 12/07/2017 Amendments: 1
Call Order: 042 Highway Number:
Items: 155 Counties: Pinal

Call Number 2017042 has Addenda Number (1) issued:
Changes to Specifications, Changes to Bid Schedule.

December 07, 2017 02:17 PM MST

You must be logged in to view item data.