New Try the new experience
The new Bid Express experience is available for this page. Learn more. Maybe later

The letting has ended.
Also Available
Downloads
Addendum
012406_1 Addendum.pdf
Addendum
012406_1 Plan Sheets.pdf
Addendum
012427_1 Addendum.pdf
Addendum
012427_1 Plan Sheets.pdf
Addendum
070514_1 Addendum.pdf
Addendum
A00009_1 Addendum.pdf
Addendum
A00019_1 Addendum.pdf
Addendum
A10010_1 Addendum.pdf
Addendum
A10015_1 Addendum.pdf
Addendum
A20011_1 Addendum.pdf
Addendum
A30013_1 Addendum.pdf
Addendum
A40010_1 Addendum.pdf
Addendum
A40010_2 Addendum.pdf
Addendum
A60012_1 Addenda.pdf
Addendum
A90011_1 Addendum.pdf
Addendum
C26008_1 Addendum.pdf
Addendum
C65014_1 Addendum.pdf
Addendum
C70009_1 Addendum.pdf
Addendum
SA0364_1 Addendum.pdf
Addendum
SA1360_1 Addendum.pdf
Addendum
SA2137_1 Addendum.pdf
Addendum
SA5448_1 Addendum.pdf
Addendum
SA5953_1 Addendum.pdf

Letting of May 18, 2022

Letting information table
Letting ID: MAY1822
Cut-Off Time: 10:00:00 AM CDT
   

Proposal table
Proposal Call Order Project ID Items Amendments Counties
(18 Active Proposals, 6 Withdrawn Proposals)
A10010 010 This proposal has been withdrawn
This proposal has been moved to the letting of
A10015 040 STPC-9448(51) This proposal has been withdrawn
All Bids Rejected
A20011 050 STPR-0027(31) 26 0 GRANT
THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE, ADD 2 FT. SHOULDERS, AND PLACE AN ASPHALT SURFACE TREATMENT ON APPROXIMATELY 6.667 MILES OF HIGHWAY 190 IN GRANT COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, AGG...
A30013 080 This proposal has been withdrawn
This proposal has been moved to the letting of
A40010 095 STPC-9150(35) 36 0 SEBASTIAN
TH PURPOSE OF THIS PROJECT IS TO MILL AND INLAY APPROXIMATELY 6.467 MILES WITH ACHM SURFACE COURSE AND CONCRETE PATCHING WITH CLEANING AND FILLING OF JOINTS ON APPROXIMATELY 0.195 MILES OF HIGHWAY 255 (RIVERFRONT DRIVE) AT FORT SMITH IN SEBASTIAN COUN...
A50014 110 STPR-0034(54) 28 0 JACKSON
THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY, ALONG WITH ADDING 2'-0" SHOULDERS, ON APPROXIMATELY 12.988 MILES OF HIGHWAY 17 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BINDER AND ...
A60012 130 STPC-9253(97) 19 0 PULASKI
THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY APPROXIMATELY 4.031 MILES OF HIGHWAY 338 (BASELINE ROAD) IN PULASKI COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MIS...
A90011 160 This proposal has been withdrawn
This proposal has been moved to the letting of
070514 150 NHPP-0014(38) 54 1 COLUMBIA
THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAY 98 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, STONE BACKFILL, EARTHWORK, AGGREGATE BASE COURSE (CLASS 7), ACHM BINDER AND SURFACE ...
A00009 210 NHPP-0038(62) 31 1 LAWRENCE
THE PURPOSE OF THIS PROJECT IS TO MICROSURFACE AND INLAY APPROXIMATELY 11.23 MILES OF HIGHWAY 63 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, AGGREGATE BASE COURSE, FOG SEAL, ACHM SURFACE COURSE, HOT IN PLACE RECYCLE...
A00019 240 STPR-0028(57) 35 0 GREENE
THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 7.269 MILES OF HIGHWAY 34 IN GREENE COUNTY. THIS PROJECT CONSISTS OF EARTHWORK, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ...
012406 250 NHPP-0076(266) 37 0 VARIOUS
THE PURPOSE OF THIS PROJECT IS TO POLYMER OVERLAY 45 STRUCTURES ON VARIOUS ROUTES, IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND M...
012427 270 HSIP-0076(277) 6 0 VARIOUS
THE PURPOSE OF THIS IS TO INSTALL CENTERLINE RUMBLE STRIPES ON VARIOUS ROUTES IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF MAINTENANCE OF TRAFFIC, CENTERLINE RUMBLE STRIPES IN ASPHALT ROADWAYS, PAVEMENT MARKING, AND MISC. ITEMS.
C04015 280 9971C04015 This proposal has been withdrawn
All Bids Rejected
SA2137 550 This proposal has been withdrawn
This proposal has been moved to the letting of
C26008 320 9971C26008 12 0 GARLAND
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.97 MILES OF LAKESHORE DRIVE INTHE CITY OF HOT SPRINGS IN GARLAND COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXI...
C65014 360 9971C65014 14 1 SEBASTIAN
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.06 MILES OF VARIOUS CITY STREETS INTHE CITY OF HACKETT IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE (BASE REPLACEMENT), ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT...
C70009 390 9971C70009 10 1 UNION
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.37 MILES OF VARIOUS CITY STREETS IN STRONG IN UNION COUNTY. THIS PROJECT CONSISTS OF BORROW, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE O...
SA0364 410 9970SA0364 10 0 BAXTER
THE PURPOSE OFTHE PROJECT IS TO OVERLAY APPROXIMATELY 2.69 MILES OF COUNTY ROAD 25 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS.
SA1360 460 9970SA1360 12 0 CLEVELAND
THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 7.55 MILES OF COUNTY ROADS 33, 73, AND 88 IN CLEVELAND COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATMENT, ACHM SURFACE COURSE, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, T...
SA1842 480 9970SA1842 11 0 CRITTENDEN
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.00 MILE OF COUNTY ROAD 4, APPROXIMATELY 0.50 MILE OF COUNTY ROAD 5, AND APPROXIMATELY 1.00 MILE OF COUNTY ROAD 14 IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURF...
SA2753 570 9970SA2753 13 0 GRANT
THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 2.30 MILES OF COUNTY ROAD 45 IN GRANT COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATMENT, ACHM SURFACE COURSE, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PAVEMENT...
SA5448 620 9970SA5448 8 1 PHILLIPS
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.25 MILES OF VARIOUS COUNTY ROADS IN PHILLIPS COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, AND MISC. IT...
SA5953 630 9970SA5953 9 1 PRAIRIE
THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 8.44 MILES OF CO. RDS. 10 & 601 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF SINGLE ASPHALT SURFACE TREATMENT, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, STANDARD SIGNS, AND MISC. ITEMS

Error

Bid Express: New Roads

Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.

Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.

Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.

No thanks